Thursday, November 26, 2009

Project 10 : Final Presentation, 152 Transformation to Shut Down

Mindshapes: XZbitRUS101 & RUS101 2009/2010
152 TRANSFORMATION TO SHUT DOWN

This is the most interesting project among the 10 project,
Mr Wan need us to present ourself on how RUS101 transform us during the whole sem,
this presentation is playing nonstop which was the slides are continuously play.

Each of everyone have to present ourself according how you display the slide and only allow 30 seconds!!!
the key is
"you are the slide and the slide is you"

In relation with the XZbit RUS101 theme,
"MINDSHAPE"
As a university, our purpose is not to promote manpower for the current job market but to shape minds for the future."

Vice Chancellor, USM. NST, 9 September 2009.


In between the SHUT DOWN ceremony,

there are fews awards to credit the students.

As all of us have been finish presented our 30 seconds presentation,

means while,

RUS101 has been shut down.

Project 9B : Group Presentation

A group presentation entitled,
"Interpretations"
has been presented during the Exhibit09 ceremony.

This presentation is to present the usefulness or/and uselessness of Studio Project 1 to 8 of each group members..

This interpretations could let us and lecture know where the problem and advantages is...
thus could enhance this program for the next batch...

Project 9A : Mounting An Exhibition




This project is lead by THRusli,
he explain and giving introduce on how to mounting an exhibition using BOXES.

5 best assignment will be display on the boxes surface in A4 size which is laminated,
a group made out of 15 will together present the exhibition based on different arrangement of boxes in E48A...


Below are the 5 images of the best assignment of mine...


Logo Design

Light Box


A Nook to Aspire


George Town Spaces


Balloonmen Costume


First of all,
each of everyone have to prepare the 5 best assignment images,
then we have to decide how to arrange the boxes position,
as THRusli said,
the better way to present the boxes,
is make it visually clean, tidy, and not messy.

Thus, we have chosen the suitable site that suit to our boxes arrangement,
due to our site is not enough of spaces to display the boxes,
so, we decided hang some of the boxes up on the ceiling and some in front the aluminium bar.


Below are the final arrangement of the boxes...













Project 8 : Constructing for real, One Malaysia Community Construction


A trip going to Balik Pulau really an unforgettable moment for me..This trip is handed by Sr. Zahry,
and leads by Faiz.

Our aim is
"To design and produce for community (outdoor) living."

Theme,
"Turning Things Around"

Product,
"Recreation and Significance Landmarks"

This trip took 3 days 2 nights,
during the days in Balik Pulau,
different groups has formed to finish different task,
for me,
I've involved at painting the outdoor wall,
turn dull wall into a attractive wall..

it was really really really hot during the task carry on...
till i've over tanned skin "sun burn",

For this project,
Sr. Zahry has teach us how to carry different task in the same time and different phases,
as the build environment practice right now...

Besides that,
Mr Seng,
the upcoming Head of the Local JKKR,
was so kind and friendly to us,
he prepare
tools,
equipment,
transportation, and
moon cake for us.

He also bring us have a look of the fire flies besides the river in the wet land area.
It was really a exciting "Hunting Fire Flies" in the dark night,
and,
Mr Seng was given some introduction about the Fire Fly.


Below are the pictures...


before depart


Our task site


Sr. Zahry giving speech


Me, wearing a yellow construction head.


Painting the outdoor wall


surveying the site around


breakfast at "Air Terjun Titi Kerawang"


Renovated bamboo and tyre outdoor recreation set.


group photo at the kinder garden entrance with the obelisk


Frenzzz

Wednesday, November 25, 2009

Project 7 : Bamboo Break



Most of them has back to their hometown to celebrate Hari Raya Aidilfitri and having holiday..
but me,
stay for a whole week inside campus.

In relation with the,
Project 8 : One Malaysia Community Construction,
this project was purposely to let us understand the Bam
boo itself characteristic and the its purpose as a Bamboo.
Bamboo is widely use in Asia,
they use it for,
construction,
building structure,
handy craft,
decoration purposes,
and even cooking.

Bamboo not only strong in tension, and having the elastic character,
besides that,
bamboo is low in cost and sustainable consumption.
That's why people using people or such usages that i mention above.

Back to this project,
Mr Wan want us to create a 1 meter cubic of bamboo cube.
Joints and tie knots have to consider,
because different joints and tie knots have different purposes to specific situation.
During 101 Potluck Bamboo Do,
Mr Wan has given a short conduct an impromptu to,
"From Lego Pieces to Lego Land"
After that,
he with others studio master started examining all the bamboo cubes,
out of our expect,
none of the bamboo cubes were pass due to the created bamboo cubes weren't meet the requirement,
and some of the bamboo cubes has been destroyed by Mr Wan.
so sad.......
huhuhu..


Below are the bamboo i created....






Project 6 : An Urban Plan

With the awarded APEX to our university,
our school decided to propose an urban plan to university as a contribution to upgrade our university performance.

A group made up with 6 different majors,
and headed by an Urban Planner..
we have chosen site number 12,
which we have to make use of the land to and develop a Communications Centre for not only for School of HBP and also in co-operate with others school,
in relation to create a strong linkage between schools.

Path,
nodes,
building function,
main entrance,
and the design,
are the main details we need to consider..

Thus we have come out a simple and yet compact information,
on both A3 size hard copy and soft copy,
to present to Mr WB.

As Mr Wan said, "things are always change and uncertainty, you have to keep alert to meet different situation"...
so, before the due date,
changes happened,
and we have to do it again and changed the format that Mr Wan mention....

Luckily, our urban plan lastly submitted...
Hope all of the proposal done by us could meet the requirement,
and meet the APEX standard...